Monday, March 26, 2012

I thought this was a 2 1/2 bath house...

The upstairs bathroom demolition went so well you can't even tell that there was ever even a bathroom there.  

All that remains are the light fixtures.
The toilet and the old tub are now hanging out in the the other half of the attic. The tub will have to be cut in half to get it out of the house. So that is a project for a later date.
Hubby removed a small linen closet from the hallway, which will create the new entrance to the bathroom. Next step is for the plumber to come and add the pipes to be able to put in a new tub, toilet and sinks. Hubby will be framing up new walls to expand the bathroom and close off the original doorway.
Little lady points out a preview of what I've been working on. The downstairs master bath toilet is now sitting in the middle of the bedroom floor. I have had a good time busting out tile and pulling apart trim the last two days. Although my arms by the end of the day tell a different story...